|
 |
|
 |
|
| From a damp
vaulted cellar before conversion.. |
|
|
 |
|
|
| ..to the
completed games room |
|
 |
 |
|
|
| Earthen floor to
be excavated. |
|
 |
 |
|
|
 |
|
 |
|
 |
| |
|
Here
the walls and vaulted ceiling have been lined with cavity drain membrane (CDM),
with battens fixed ready for plasterboarding. |
 |
|
|
 |
|
 |
|
> next gallery |
| After
plasterboarding, the walls and ceiling have been plastered and and
skimmed. |
|
|
|
|