Gallery

A selection of images illustrating the work carried out by Oxford Basements.


A cellar in Buckingham: before and during conversion.


This irregularly-shaped cellar has plenty of curved walls and arched ceilings. The same area after fitting the cavity drain membranes (CDMs) to walls, ceiling and floor. Here the chipboard floor has been laid over the CDM.


Left: the stairwell and stairs are fully sealed with cavity drain membrane.

Above: new steps are constructed over the membrane later on.
Existing services are carefully sealed around. The 20mm floor cavity drain membrane in place.
Floor insulation is added.. ..and flooring (chipboard chosen here) is then laid.

Other work in progress

'New builds' may also require the attention of Oxford Basements. Here the wall is lined with cavity drain membrane; the CDM floor is yet to be laid.
> next gallery
Email: sales@oxfordbasements.co.uk
Freephone: 0800 317763
© Copyright 2008 Oxford Basements Ltd.
All rights reserved.